Atlas · Western Sahara / Carbon Projects
CARBON PROJECT

Native Energy Hydraid BioSand Water Filter Programme West Africa

Gold Standard · GS1264 · Ghana

Credits issued
0
tonnes CO₂-equivalent
Credits retired
0
—
Remaining
0
issued and not yet retired
Status
Certified design
Gold Standard Certified Design

About this project

The micro-scale VPA NativeEnergy Clean Water Programme West Africa VPA (01)- Ghana is the first VPA to be included in the micro scale PoA “NativeEnergy Clean Water Programme West Africa” . The VPA aims to reduce ligneous fuel consumption used for domestic/non-residential water treatment by introducing zero energy Clean water technology to replace the use of boiling. The VPA shall be implemented by the CME Native Energy and shall be implemented in the Greater Accra Region of The Republic of Ghana. This micro-scale VPA shall apply the Gold Standard methodology “Technologies and Practices to Displace Decentralized Thermal Energy Consumption”, and therefore shall incorporate any project technologies or activities that displace thermal energy consumption in existing baseline practices - namely the Biosand filters.

The record

Project ID
GS1264
Registry
Gold Standard
Type
Clean Water · Household & Community
Removal or reduction
Reduction
Methodology
GS TPDDTEC Reduced emissions from cooking and heating – technologies and practices to displace decentralized thermal energy consumption v 1.
Developer
NATIVE A PUBLIC BENEFIT CORPORATION · 6 projects
Country
Ghana
First vintage
—
Crediting period
2012-07-07 to 2019-07-06
Estimated yearly credits
10,000
Scale
Micro Scale · POA
Sustainable Development Goals
Goal 3: Good Health and Well-Being · Goal 8: Decent Work and Economic Growth · Goal 13: Climate Action · Goal 6: Clean Water and Sanitation
Data from
Berkeley VROD v2026-08 + Gold Standard registry

Community involvement

The registry record we hold does not describe the communities involved.

Registry documents (the project design document and validation report) normally cover consultation and benefit-sharing; open the record in the registry to read them.
Sustainable Development Goals claimed: Goal 3: Good Health and Well-Being · Goal 8: Decent Work and Economic Growth · Goal 13: Climate Action · Goal 6: Clean Water and Sanitation

Status and timeline

Registry status
Gold Standard Certified Design (Certified design)
First credits (vintage)
none yet
Crediting period
2012-07-07 to 2019-07-06
Credits issued
0 (retired 0)

Location

Corrected location The registry location had swapped or sign-flipped coordinates; fixed and checked against the country border
Coordinates
8.0000, -2.0000
Source
Gold Standard registry (public API), corrected
Note
Registry gave latitude 8, longitude 2 (flip lon); corrected to the only variant that falls inside Ghana
Open on the full map

Other clean water projects in Ghana

GS1264: Native Clean Water Programme West Afri...
GS1294 · Gold Standard Certified Project
82,758
GS1264: Native Clean Water Programme West Afri...
GS5802 · Gold Standard Certified Project
44,112
GS12693 VPA-3 Access to Clean Water in Ghana
GS13026 · Listed
0
AquaCarbon Safe Water
GS23182 · Listed
0
AquaCarbon Ghana VPA1
GS23183 · Listed
0
Hygiene and Environmental Care for Tanks and O...
GS23468 · Listed
0
Credit totals and status are as compiled in the Berkeley Voluntary Registry Offsets Database v2026-08 (CC BY 4.0) and change as the registries update. Please check the registry record before you quote a figure.
Guest preview · 165s left Explore until the timer ends. Then you’ll be asked to log in or create an account (about two minutes) to keep going.
Ask Atlas