Atlas · Mali / Carbon Projects
CARBON PROJECT

Kairouan Solar Farm in Tunisia

Gold Standard · GS13077 · Tunisia

Credits issued
0
tonnes CO₂-equivalent
Credits retired
0
—
Remaining
0
issued and not yet retired
Status
In the pipeline
Listed

About this project

The Kairouan Solar Plant in Tunisia (Project) is a 120MWp Photo Voltaic (PV) Solar Power Plant in the governorate of Kairouan in Tunisia which is being developed by Kairouan Solar Plant Sarl. whose majority shareholder is AMEA Power. The process of generating power through solar resources is a clean technology, as there is no fossil fuel fired, or no greenhouse gases emitted during the process. The project is currently under construction and is scheduled to achieve its commercial operations date by the 31st of December 2025 (Q4 2025). The project will replace anthropogenic emissions of greenhouse gases (GHG’s) estimated to be approximately 131,823tC023e per annum, thereon displacing average 237,085MWh/year amount of electricity, which is dominated by thermal fossil fuel (natural gas) based power plant.

The record

Project ID
GS13077
Registry
Gold Standard
Type
Solar - Centralized · Renewable Energy
Removal or reduction
Reduction
Methodology
ACM0002 Grid-connected electricity generation from renewable sources
Developer
AMEA Power Ltd · 6 projects
Country
Tunisia
First vintage
—
Crediting period
2024-09-23 to 2029-09-23
Estimated yearly credits
131,823
Scale
Large Scale · Standalone
Sustainable Development Goals
Goal 13: Climate Action · Goal 8: Decent Work and Economic Growth · Goal 7: Affordable and Clean Energy
Data from
Berkeley VROD v2026-08 + Gold Standard registry

Community involvement

The registry record we hold does not describe the communities involved.

Registry documents (the project design document and validation report) normally cover consultation and benefit-sharing; open the record in the registry to read them.
Sustainable Development Goals claimed: Goal 13: Climate Action · Goal 8: Decent Work and Economic Growth · Goal 7: Affordable and Clean Energy

Status and timeline

Registry status
Listed (In the pipeline)
First credits (vintage)
none yet
Crediting period
2024-09-23 to 2029-09-23
Credits issued
0 (retired 0)

Location

Country only The registry gives the country only, so the project is not drawn on the map

The registry gives Tunisia as the location, so this project is not drawn on the map. It is counted in the country totals.

Other solar - centralized projects in Tunisia

Feriana solar power
GS12955 · Gold Standard Certified Design
0
Tataouine Solar Photovoltaic Plant in Tunisia
VCS1963 · Late to Verify
0
Credit totals and status are as compiled in the Berkeley Voluntary Registry Offsets Database v2026-08 (CC BY 4.0) and change as the registries update. Please check the registry record before you quote a figure.
Guest preview · 177s left Explore until the timer ends. Then you’ll be asked to log in or create an account (about two minutes) to keep going.
Ask Atlas