CARBON PROJECT

Jbel Sendouq-Khalladi ("Khalladi") wind farm project in Morocco

Gold Standard · GS5073 · Morocco

Credits issued
316,720
tonnes CO₂-equivalent
Credits retired
5,921
2% of issued
Remaining
310,799
issued and not yet retired
Status
Active
Gold Standard Certified Project

About this project

The objective of the proposed project, the Jbel Sendouq-Khalladi (“Khalladi") wind farm project in Morocco, developed by UPC Renewables SARL (hereafter referred to as “UPC"), is to generate electricity using state-of-the-art wind power generation technology.UPC is one of the most successful privately owned wind energy developers in the world. Building on a track record of implementing wind energy projects in Europe and the United States, UPC has ongoing wind project development activities in Europe, North Africa, China, and the Philippines .The proposed project is to be located in the Tangier-Tetouan Region, Fahs Anjra Province, Morocco. 40 wind turbines with a nominal unit capacity of 3 MW will be installed, providing a total capacity of 120 MW. The net expected electricity generation is estimated at 296,100 MWh/year . The Load Factor (Net Capacity Factor) is 28.17% or 2467.69 full load hours annually. The wind farm production will be wheeled through the national electricity grid, for the use of UPC Renewables’ clients .The proposed project is developed in the context of the new regulatory framework in Morocco (the Law 13.09). This new Law 13.09 was adopted in Morocco in March 2010 to promote large scale renewable electricity generation projects offering the possibility for private operators to produce electricity from renewable resources and to sell the generated electricity to a pool of clients.The baseline scenario is the supply of equivalent annual power output by the national electricity grid. The baseline scenario is the same as the scenario existing prior to the start of implementation of the project activity.The electrical energy produced by the project activity will substitute electricity currently supplied by the national grid managed by the public utility, Office National de l’Electricité et de l’Eau Potable (ONEE ), and thus result in the reduction of Green House Gas (GHG) emissions, mainly CO2, associated with the fossil fuel dominated power plants feeding the national grid.Using a new and renewable local source of energy, the proposed project will contribute to the reduction of GHG emissions, the decrease of the country’s energy dependence vis-à-vis the importation of fossil fuels and will directly and indirectly help create new jobs. As such, the project activity is expected to contribute to the development of wind energy in Morocco and hence to help achieve the objectives of Morocco’s national strategy for renewable energy development. Generally speaking, the project’s contribution to Morocco’s sustainable development can be summarized by the following benefits:•Diversification of the national supply of energy;•Project in line with the Moroccan government’s objectives to increase the use of renewable energy and reduce reliance on imported fossil fuels. The diversification of energy sources for electricity production is one of the objectives of the new Moroccan energy strategy with an objective of 20% of renewable energy capacity in the nation’s electricity production in 2012 and a targeted development of 2,000 MW of installed wind capacity by 2020 .•Local development of renewable energy usage;•Reduction of the country’s imports in hard currency by the use of wind power instead of electricity mainly currently produced from imported coal, oil products and natural gas;•Reduction of national GHG emissions in accordance with the objectives of the UNFCCC ;•Contribution to the development of national and foreign investments in the energy sector;•Clean technology transfer and local capacity building in wind electricity generation and optimal use of wind energy in a heavy industry ;•Increases local employment opportunities during the construction phase and subsequently for the project’s operation phase. Estimated project start date: February 2018

The record

Project ID
GS5073
Registry
Gold Standard
Type
Wind · Renewable Energy
Removal or reduction
Reduction
Methodology
ACM0002 Grid-connected electricity generation from renewable sources
Developer
ACWA Khalladi · 2 projects
Country
Morocco
First vintage
2018
Crediting period
2014-05-01 to 2026-04-30
Estimated yearly credits
220,239
Scale
Large Scale · Standalone
Sustainable Development Goals
Goal 7: Affordable and Clean Energy · Goal 13: Climate Action · Goal 8: Decent Work and Economic Growth
Data from
Berkeley VROD v2026-08 + Gold Standard registry

Community involvement

The registry record we hold does not describe the communities involved.

Registry documents (the project design document and validation report) normally cover consultation and benefit-sharing; open the record in the registry to read them.
Sustainable Development Goals claimed: Goal 7: Affordable and Clean Energy · Goal 13: Climate Action · Goal 8: Decent Work and Economic Growth

Status and timeline

Registry status
Gold Standard Certified Project (Active)
First credits (vintage)
2018
Crediting period
2014-05-01 to 2026-04-30
Credits issued
316,720 (retired 5,921)

Credits by vintage year

Issued and retired, tonnes CO₂-equivalent

Location

Project location Location stated by the registry for this project
Coordinates
35.7560, -5.5610
Source
Gold Standard registry (public API)
Open on the full map

Other wind projects in Morocco

Oualidia 1&2 Wind Projects.
VCS1989 · Registered
74,475
Jbel Sendouq-Khalladi ("Khalladi") wind farm p...
GS10309 · Gold Standard Certified Project
34,439
FOUM EL OUED WIND FARM PROJECT
VCS1062 · Withdrawn
0
Oualidia 1&2 Wind Projects
VCS1977 · Inactive
0
Credit totals and status are as compiled in the Berkeley Voluntary Registry Offsets Database v2026-08 (CC BY 4.0) and change as the registries update. Please check the registry record before you quote a figure.
Guest preview · 116s left Explore until the timer ends. Then you’ll be asked to log in or create an account (about two minutes) to keep going.
Ask Atlas